Offshore Pipeline CP Retrofit Strategies
Add bookmarkMany miles of offshore pipelines worldwide are reaching, or have exceeded, the original design life of their cathodic protection systems.
Many of these pipelines will be required to function for another 10, 15 or even 20 years. This paper will describe some rational strategies for achieving the desired life extension of the external corrosion control systems at the minimum installed cost. Preliminary surveys, retrofit design methods, installation procedures and hardware, verification and routine post installation inspection methods will be discussed.
By Jim Britton, CEO, Deepwater Corrosion Services
LEARN MORE:
- The Top 10 Oil & Gas Companies in the World
- 50 Oil & Gas People You NEED To Follow On Twitter
- Oil & Gas Industry: An Introduction
- Oil and Gas Production - An Introduction
- Oil and Gas Technology: The Future Is Now
-
FPSO Resource Centre: Introduction to Floating Production Storage and Offloading
Have Your Say Rate this feature and give us your feedback in the comments section below |