The increased popularity of modular data center design is not surprising. Consider: by moving construction and integration off site, those tasks can be performed under tightly controlled factory conditions by trained specialists. This can happen while on-site preparation continues, compressing construction timelines. Reducing the time on a project reduces the cost of that project and improves overall total cost of ownership (TCO) by shortening the time to revenue. Factory integration also tends to reduce service issues and costs. Bottom line: the TCO of a PMDC deployment can be significantly less than a traditional stick build. Download the report - produced by Vertiv on the hybrid designs in hyperscale data centers.